Inteligência meteorológica para decidir

Saiba o que o tempo significa para o que acontece a seguir.

Escolha a operação, a preocupação meteorológica e o horizonte. A MetOry transforma evidência de previsão e observação de confiança numa vista de preparação — não um aviso oficial e não uma pontuação de risco.

Contexto da operação

Mais

Preocupação meteorológica

Mais

Escolha contexto, lugar, momento e preocupação meteorológica.

Checking official-warning status…

Source forecast visual

Current weather intelligence

Plain-language ECMWF Open Charts. Not official warnings and not MetOry risk scores.

Rainfall outlook

Rainfall probability · Europe · next 24 hours

LAST KNOWN GOOD

Last known good ECMWF forecast chart · source product, not a MetOry official warning.

ECMWF Open Charts: Probabilities: total precipitation, last 24 hours. Europe. Base 13 Sep 2026 00 UTC. Valid 14 Sep 2026 00 UTC.

Shows where ensemble members indicate a greater likelihood of measurable rainfall during the selected period.

Where: Europe

Base: 13 Sep 2026 00 UTC

Valid: 14 Sep 2026 00 UTC · T+24

Source: ECMWF ENS · ECMWF Open Charts · CC BY 4.0

Product: Probabilities: total precipitation, last 24 hours

© European Centre for Medium-Range Weather Forecasts (ECMWF)

ECMWF ENS probability on this chart is ECMWF’s product. It is not MetOry confidence, MetOry probability, or MetOry risk %.

Strong wind outlook

Maximum 10 m wind-gust probability · Europe · next 24 hours

LAST KNOWN GOOD

Last known good ECMWF forecast chart · source product, not a MetOry official warning.

ECMWF Open Charts: Probabilities: maximum of 10 m wind gust, last 24 hours. Europe. Base 13 Sep 2026 00 UTC. Valid 14 Sep 2026 00 UTC.

Areas where ECMWF ensemble forecasts indicate increased probability of strong wind gusts.

Where: Europe

Base: 13 Sep 2026 00 UTC

Valid: 14 Sep 2026 00 UTC · T+24

Source: ECMWF ENS · ECMWF Open Charts · CC BY 4.0

Product: Probabilities: maximum of 10 m wind gust, last 24 hours

© European Centre for Medium-Range Weather Forecasts (ECMWF)

ECMWF ENS probability on this chart is ECMWF’s product. It is not MetOry confidence, MetOry probability, or MetOry risk %.

Wind + rain outlook

Strong wind and measurable precipitation together · Europe · next 24 hours

LAST KNOWN GOOD

Last known good ECMWF forecast chart · source product, not a MetOry official warning.

ECMWF Open Charts: Combined probabilities wind speed > 10 m/s and total precipitation > 1 mm. Europe. Base 13 Sep 2026 00 UTC. Valid 14 Sep 2026 00 UTC.

Areas where strong wind and measurable precipitation are forecast together. ECMWF combined probability is not MetOry operational risk.

Where: Europe

Base: 13 Sep 2026 00 UTC

Valid: 14 Sep 2026 00 UTC · T+24

Source: ECMWF ENS · ECMWF Open Charts · CC BY 4.0

Product: Combined probabilities wind speed > 10 m/s and total precipitation > 1 mm

© European Centre for Medium-Range Weather Forecasts (ECMWF)

ECMWF ENS probability on this chart is ECMWF’s product. It is not MetOry confidence, MetOry probability, or MetOry risk %.

Rede de fontes

Meteorological source network

Global forecasting, Earth-observation and national meteorological authorities that support MetOry's weather evidence layer.

Fontes globais em destaque

Fontes globais secundárias

Serviços meteorológicos nacionais

National authorities add local observation networks, regional numerical forecasting expertise and, where connected, authoritative official weather warnings.

Ver a rede de fontes completa →

Source attribution does not imply endorsement of MetOry.

Research & Applied Science

From meteorological evidence to operational preparedness.

MetOry combines trusted meteorological evidence, verification, official warnings and operational context to study how weather information can support earlier and more structured preparation.

01

Multi-source evidence

Forecasts, observations and official warnings remain traceable to their original source.

02

Verification

Forecast evidence is tested against real observations without silently changing time, quality or source semantics.

03

Preparedness research

We study the path from warning awareness to acceptance, preparation, action and exercise.

04

Outcome & learning

Actions, exercises and outcomes can be recorded to support future evaluation and improvement.

MetOry does not replace national meteorological authorities. Official warnings remain authoritative and are presented separately from MetOry decision-support outputs.

Como a MetOry funciona

Como a MetOry transforma o tempo em ação

Observar, verificar, compreender, decidir e agir continuam a ser a sequência. O indicador acima é a prontidão do plano a partir das suas escolhas — não uma pontuação de risco meteorológico.

Ver com clareza. Preparar cedo. Operar em segurança.

01

OBSERVE

Trusted meteorological evidence

02

VERIFY

Freshness, provenance and missing data

03

UNDERSTAND

Your person, route, field, site or community

04

DECIDE

Impact, timing and what still must be confirmed

05

ACT

Preparation and response — not an official command

Decision Studio

A experiência interativa principal do produto.

INTERACTIVE PREVIEW. Workflow templates, not operationally science-backed engines.

Plan → Risk → Decision → Action → Proof

Build a lightweight operational context, then walk a labelled synthetic journey. Checkboxes stay on this device.

Open Decision Studio

What this wave is not

Not live Kairos and not calibrated confidence. Evidence Ledger and Action Packs are not live. Official warnings stay on their own lane.

Last Minute

Algo mudou. E agora?

Fast scenario cards. INTERACTIVE PREVIEW.

Open Last Minute
Express

Já sabe o que precisa.

Place, risk type, NOW / 24 / 72 as a quick-look preview. No live query.

Open Express
Porque as fontes importam

Três camadas, nunca misturadas.

Sources we build on remain named. The identity strip above is attribution, not a live registry claim.

A. Data / science sources

Authoritative meteorological centres and satellite operators produce the science. Named sources and current public readiness come from the Provider Registry, not a marketing list.

B. Official warning sources

Competent national authorities issue official warnings. MetOry does not replace them. Missing warning-source data is not “no warning”. QUERY_FAILED is not NO_ALERT.

C. MetOry derived interpretation

Contextual impact, timing and decision-support outputs. A separate object from official warnings. Never visually merged with layer B.

PLANNED
Source status is temporarily unavailable. Named sources are not listed from a fallback catalogue.

SOURCE_STATUS_UNAVAILABLE

Limite do aviso oficial

Os avisos oficiais continuam oficiais.

Official warning

Attributed to the issuing authority. MetOry does not replace issuing authorities. An unconnected adapter is not an all-clear.

MetOry advisory

A separate interpretation for your context. Not an official warning, not a safety command, and not an all-clear.

O seu contexto

A mesma plataforma. Portas diferentes.

Choose the language of your work. These are not seven products.

I have a field / farm

Scenario. A night harvest on an open vineyard, with transfer into a cold tank.

Output. A briefing for that field and activity — evidence, official warning, MetOry advisory.

Impact. Rain or wind can close the picking window before the crew is in place.

I have a route / I am travelling

Scenario. A timed night handover at a port plus a motorway window.

Output. A corridor briefing. Official warnings stay on their own card.

Impact. Wind or rain can delay the handover. This is not turn-by-turn navigation.

I have a construction site / field operation

Scenario. Coastal scaffold and a crane window tied to a work shift.

Output. A site briefing that names what must still be confirmed before work proceeds.

Impact. Wind can stop the crane; MetOry does not certify the engineering stop rule.

I have a business / facility

Scenario. A warehouse with limited open loading and a weekday shift.

Output. Activity-specific context for the open yard versus the closed hall.

Impact. The same building is not one risk profile.

I have a city / community

Scenario. A municipality that must brief crews and the public when weather becomes operational.

Output. A community briefing that keeps official warnings attributed to the issuer.

Impact. Missing warning-source data is not treated as “no warning”.

I have a portfolio

Scenario. Several sites, teams and corridors under one operating profile.

Output. A request path for scoped portfolio monitoring — not a self-serve control room.

Impact. Volume does not turn illustrative demos into live operational engines.

I have customers / members

Scenario. A professional body that needs members to prepare in their own work language.

Output. A shared briefing pattern members can reuse. Not a second official warning service.

Impact. An alert that never reaches the person who must act still fails.

Integridade científica

Porque pode confiar no processo

  1. If evidence is missing, we do not call the risk low.
  2. Model agreement is not probability.
  3. Official warnings remain separate.
  4. Every number can be traced to its source.
  5. Thresholds are not automatic operational orders.
  6. We do not silently blend incompatible sources.

What we do not claim

  • MetOry does not replace official authorities.
  • MetOry does not claim to forecast better than provider institutions.
  • Unknown data is not treated as safe.
  • Scientific products are not called VERIFIED without verification.
  • A modelled benefit is not presented as an observed saving.
Dark storm clouds over an open field.
Photo: Pixabay / Pexels
Context, not spectacle

Weather becomes operational when it meets a place of work.

One photograph. The chart above is an ECMWF Open Charts source product, not a MetOry official warning and not a MetOry risk score. This photograph is not a live scene and not a disaster record.

Missão

MetOry did not begin with a technology trend.

Across 21 years in meteorology, the same gap appeared again and again: forecasts existed, but they did not always reach the right person, in the language of their own work, while there was still time to act. MetOry exists to close that gap.

Twenty-one years is problem knowledge — not a claim of authority over ECMWF, NOAA or national meteorological services. AI-assisted analysis and workflows may appear later in the product; they are not the hero of this page.

Comece pelo seu contexto — não por outro ecrã do tempo.

Crie um plano no Decision Studio ou leia um briefing de exemplo etiquetado. Um piloto Enterprise continua disponível para um compromisso delimitado.